Our remodel of the cabin in Fort Bragg continues although it seems to be slowing somewhat. I had hoped the workers would have started on the tile, not yet it seems. But, the new wood floor is installed with the exception of the spare bedroom.
New floor
That is the new range in the middle of the room, it should be installed this week.
The kitchen sink and faucet are in but not hooked up yet, ditto for the dishwasher.
Kitchen sink, faucet and dishwasher
We are very pleased with how the sweatshirt grey paint we chose for the back cabinets combines with the stainless steel refrigerator. Since living, dining and kitchen are essentially one room we didn’t want the fridge to dominate the room. The grey paint softens the stainless industrial look.
Sweatshirt grey cabinets and stainless steel fridge
And the new lighting was a successful choice. Here are the pendants over the kitchen island.
The new window for the bathroom arrived.
Bathroom window
It will go in this spot, in the back of the shower.
Area for new bathroom window
Can you believe it was clear glass before, necessitating a privacy screen? The window is placed just to the right of the front door.
Bathroom window
The dry rot means we will have to replace some of the boards on the deck.
I’m not sure I will be able to get up to the coast again until the end of this month. Hopefully we will almost be finished by then. Look for more progress reports.